# GDPR Compliance Checklist This document tracks GDPR compliance implementation for the KoproGo platform. ## ✅ Implemented Features ### Article 15: Right to Access (Data Export) - [x] **Endpoint**: `GET /api/v1/gdpr/export` - [x] **Authentication**: JWT-based, self-service + SuperAdmin bypass - [x] **Authorization**: Users can only export their own data (unless SuperAdmin) - [x] **Data Included**: - [x] User profile (email, name, role, created_at, updated_at) - [x] Owner profiles (all linked via email) - [x] Related data (buildings, units, expenses, meetings, documents) - [x] Ownership history (unit_owners with temporal tracking) - [x] **Export Format**: JSON with structured data - [x] **Metadata**: Total items count, export date (RFC3339) - [x] **Audit Logging**: Success and failure events persisted to database - [x] **Tests**: Unit tests (use cases, DTOs) + E2E tests ### Article 17: Right to Erasure (Data Deletion) - [x] **Endpoint**: `DELETE /api/v1/gdpr/erase` - [x] **Authentication**: JWT-based, self-service + SuperAdmin bypass - [x] **Authorization**: Users can only erase their own data (unless SuperAdmin) - [x] **Anonymization Strategy**: - [x] Users: `is_anonymized=true`, email/name/phone replaced with `anonymized_*` - [x] Owners: Same anonymization pattern - [x] Preserves referential integrity (7-year retention for financial records) - [x] **Legal Holds Validation**: - [x] Checks for unpaid expenses before erasure - [x] Returns 409 Conflict if legal obligations prevent deletion - [x] **Audit Logging**: Success and failure events persisted to database - [x] **Tests**: Unit tests (use cases, DTOs, repositories) + E2E tests planned ### Article 17: Erasure Eligibility Check - [x] **Endpoint**: `GET /api/v1/gdpr/can-erase` - [x] **Functionality**: Pre-flight check for legal holds - [x] **Returns**: Boolean `can_erase` with user_id - [x] **Audit Logging**: GdprErasureCheckRequested event logged ### Article 20: Right to Data Portability - [x] **Machine-Readable Format**: JSON export with consistent structure - [x] **Complete Data Set**: All personal data included in export - [x] **Timestamp Standardization**: RFC3339 format for all dates ### Article 30: Records of Processing Activities - [x] **Audit Log Table**: `audit_logs` with comprehensive tracking - [x] **Retention Policy**: 7-year retention (Belgium GDPR requirement) - [x] `retention_until` field with default NOW() + 7 years - [x] Index on retention_until for efficient cleanup - [x] **Event Types**: 5 GDPR-specific event types - [x] GdprDataExported - [x] GdprDataExportFailed - [x] GdprDataErased - [x] GdprDataErasureFailed - [x] GdprErasureCheckRequested - [x] **Audit Data Captured**: - [x] Event type, timestamp, user_id, organization_id - [x] Resource type and ID - [x] Success/failure status - [x] Error messages (for failures) - [x] Metadata (operation-specific details) - [x] IP address and user agent (infrastructure fields ready) - [x] **Persistence**: Async logging to database via `AuditLogger` - [x] **Repository Methods**: 7 methods for querying/managing audit logs - [x] create, find_by_id, find_all_paginated - [x] find_recent, find_failed_operations - [x] delete_older_than, count_by_filters - [x] **Tests**: E2E tests verify persistence and retention ## 🚧 Partially Implemented / TODO ### General GDPR Requirements - [ ] **Privacy Policy**: Document data processing activities - [ ] **Consent Management**: Cookie consent, data processing consent - [ ] **Data Protection Officer (DPO)**: Designate DPO contact - [ ] **Data Breach Notification**: 72-hour breach notification procedure - [ ] **Data Minimization**: Review data collection practices - [ ] **Purpose Limitation**: Document purpose for each data field - [ ] **Storage Limitation**: Automated cleanup of expired data - [ ] **Security Measures**: Encryption at rest, encryption in transit - [ ] **Data Processing Agreements**: Contracts with third-party processors ### Article 13-14: Information to be Provided - [ ] **Transparency**: Inform users about data processing at registration - [ ] **Privacy Notice**: Clear explanation of data usage ### Article 16: Right to Rectification - [ ] **Endpoint**: `PATCH /api/v1/gdpr/rectify` (user profile updates) - [ ] **Functionality**: Allow users to correct inaccurate data ### Article 18: Right to Restriction - [ ] **Endpoint**: `POST /api/v1/gdpr/restrict` - [ ] **Functionality**: Temporarily restrict data processing ### Article 21: Right to Object - [ ] **Endpoint**: `POST /api/v1/gdpr/object` - [ ] **Functionality**: Allow users to object to data processing ### Article 25: Data Protection by Design and Default - [ ] **Pseudonymization**: Hash or mask sensitive data where possible - [ ] **Access Controls**: Role-based access control (RBAC) - partially implemented - [ ] **Encryption**: Encrypt sensitive fields in database ### Article 32: Security of Processing - [ ] **Encryption at Rest**: Database encryption (PostgreSQL TDE) - [ ] **Encryption in Transit**: HTTPS enforced (production) - [ ] **Password Security**: Bcrypt with proper cost factor (implemented) - [ ] **Session Management**: Secure JWT handling (implemented) - [ ] **Audit Log Security**: Access-controlled audit log viewing - [ ] **Backup Encryption**: Encrypted backups with retention ### Article 33-34: Data Breach Procedures - [ ] **Breach Detection**: Monitoring and alerting system - [ ] **Breach Response Plan**: Documented incident response procedure - [ ] **Notification Templates**: Email templates for breach notifications ## 📊 Test Coverage ### Unit Tests - [x] **Domain Layer**: 9 tests for GDPR entities - [x] **Application Layer**: - [x] GDPR DTOs: 6 tests - [x] GDPR Use Cases: 9 tests (mocked repository) - [x] AuditLogger: 1 test - [x] **Infrastructure Layer**: - [x] PostgresGdprRepository: Compile-time verified queries - [x] GDPR Handlers: 3 structural tests - [x] **Total**: 180 unit tests passing ### Integration Tests - [x] **E2E GDPR Tests**: 2 tests in `tests/e2e_gdpr_audit.rs` - [x] Audit log persistence for export - [x] Audit log persistence for erasure check - [x] 7-year retention validation - [ ] **E2E GDPR Workflows**: Full GDPR export/erase scenarios (planned) ### Planned Tests - [ ] **BDD Scenarios**: Cucumber tests for user-facing GDPR workflows (Phase 9) - [ ] **Playwright E2E**: Frontend GDPR interface tests (Phase 12) - [ ] **Performance Tests**: Load testing for audit log writes ## 🔒 Security Considerations ### Implemented - [x] **Authentication**: JWT-based with role enforcement - [x] **Authorization**: Self-service + SuperAdmin bypass - [x] **Input Validation**: UUID validation, DTO validation - [x] **SQL Injection Prevention**: sqlx with parameterized queries - [x] **Error Handling**: Generic error messages, detailed logging - [x] **Audit Logging**: All GDPR operations logged ### TODO - [ ] **Rate Limiting**: Prevent abuse of GDPR endpoints - [ ] **IP Address Logging**: Capture client IP in audit logs - [ ] **User Agent Logging**: Capture client user agent in audit logs - [ ] **MFA for Erasure**: Require additional verification for data erasure - [ ] **Email Confirmation**: Send confirmation email after export/erase - [ ] **Cooldown Period**: Prevent repeated export requests (e.g., 1 per day) ## 📅 Retention Policies ### Implemented - [x] **Audit Logs**: 7-year retention (Article 30, Belgium requirement) - [x] Database field: `retention_until` - [x] Index for efficient cleanup queries - [x] Repository method: `delete_older_than()` ### TODO - [ ] **Automated Cleanup Job**: Cron job to delete expired audit logs - [ ] **Anonymized User Cleanup**: Determine retention for anonymized data - [ ] **Document Retention**: Define retention for uploaded documents - [ ] **Financial Data Retention**: 7-year minimum for Belgium law ## 🌍 Multi-Tenancy Considerations ### Implemented - [x] **Organization Isolation**: All GDPR operations scoped to organization_id - [x] **SuperAdmin Override**: SuperAdmin can export across organizations - [x] **User-Owner Linking**: Email-based discovery of related owners - [x] **Partial Anonymization**: Only anonymize owners linked to user email ### TODO - [ ] **Cross-Tenant Data Leakage Prevention**: Security audit - [ ] **Organization-Level GDPR Settings**: Custom retention policies per org ## 📋 Next Steps (Priority Order) 1. **Phase 6**: Admin endpoints for GDPR management - [ ] `GET /api/v1/admin/gdpr/audit-logs` (with pagination/filters) - [ ] `GET /api/v1/admin/gdpr/users/:id/export` (admin-initiated export) - [ ] `DELETE /api/v1/admin/gdpr/users/:id/erase` (admin-initiated erasure) 2. **Phase 7**: Rate limiting and security hardening - [ ] Implement rate limiting for GDPR endpoints - [ ] Add IP address and user agent capture in handlers - [ ] Email notifications for export/erase operations 3. **Phase 8**: Additional GDPR rights - [ ] Right to Rectification (Article 16) - [ ] Right to Restriction (Article 18) - [ ] Right to Object (Article 21) 4. **Phase 9**: BDD scenarios (Cucumber) - [ ] GDPR export workflow - [ ] GDPR erase workflow with legal holds - [ ] Audit log verification 5. **Phase 10-11**: Frontend implementation - [ ] Privacy settings page (`/settings/privacy`) - [ ] GDPR export button + download - [ ] GDPR erase button + confirmation modal - [ ] Admin dashboard for GDPR operations 6. **Phase 12**: Playwright E2E tests - [ ] Complete export workflow (button → download) - [ ] Complete erase workflow (button → confirmation → success) - [ ] Admin GDPR management interface 7. **Phase 13**: Documentation - [ ] Privacy Policy - [ ] Terms of Service - [ ] Cookie Policy - [ ] GDPR Compliance Guide for administrators 8. **Phase 14**: Automated cleanup and monitoring - [ ] Cron job for audit log retention - [ ] Monitoring dashboard for GDPR requests - [ ] Alerting for failed GDPR operations ## 📚 References - [GDPR Official Text](https://gdpr-info.eu/) - [Belgian Data Protection Authority](https://www.autoriteprotectiondonnees.be/) - [ICO GDPR Guidance](https://ico.org.uk/for-organisations/guide-to-data-protection/guide-to-the-general-data-protection-regulation-gdpr/) ## ✅ Sign-Off - **Last Updated**: 2025-10-30 - **Reviewed By**: Development Team - **GDPR Compliance Status**: ⚠️ Partial (Core features implemented, additional requirements pending) - **Recommended Actions**: Proceed with Phase 6-8 before production deployment